Installation

Professional preparation and realization of the installation process.

Building Preparation

Inside
  • • protect floors and furniture
  • • provide access to windows
  • • provide 230V power
  • • min. temperature 5°C
Outside
  • • access at least 2 m wide
  • • no obstacles at the wall
  • • provide access for transport

Warm Installation

  • 1vapor barrier tape
  • 2mounting foam
  • 3vapor permeable tape

Prevents moisture and energy loss, ensuring the highest insulation parameters.

Delivery for Installation

Unloading is performed by the driver using specialized equipment located on the vehicle.

Client's obligations:

The client provides an appropriate place for setting up products (at a distance of up to 30 m from the vehicle).

Acceptance after Installation

During acceptance, check:

sash operation
no scratches
colors
completeness

Note: After signing the protocol, mechanical damage is not subject to complaint.