Installation
Professional preparation and realization of the installation process.
Building Preparation
Inside
- • protect floors and furniture
- • provide access to windows
- • provide 230V power
- • min. temperature 5°C
Outside
- • access at least 2 m wide
- • no obstacles at the wall
- • provide access for transport
Warm Installation
- 1vapor barrier tape
- 2mounting foam
- 3vapor permeable tape
Prevents moisture and energy loss, ensuring the highest insulation parameters.
Delivery for Installation
Unloading is performed by the driver using specialized equipment located on the vehicle.
Client's obligations:
The client provides an appropriate place for setting up products (at a distance of up to 30 m from the vehicle).
Acceptance after Installation
During acceptance, check:
sash operation
no scratches
colors
completeness
Note: After signing the protocol, mechanical damage is not subject to complaint.